Building Uranus


Checking the progress Checking the progress of Uranus
The Bridgewater site; The Uranus site in Bridgewater
Uranus is ready to go Uranus is ready to go. Here is the model at Bangor St. Autobody, in Houlton. The unusual structure at the top is to illustrate the planet's steep angle of tilt.
The installation of Uranus
Looking at Uranus from the highway